Maximum drawdown and recovery
25 October 2011

Previously, we explained how to visualize the maximum drawdown of a portfolio, a volatility measure that is intuitive for most investors.
The latest version of Portfolio Lab is enhanced to also display the recovery from the drawdown. The recovery is the first day after the trough when the portfolio losses are recovered, as shown in green in the chart below:

Portfolio maximum drawdown

Want to
Learn More?

Get in touch with our top of the line customer support team