Back to blog

Maximum drawdown and recovery

Previously, we explained how to visualize the maximum drawdown of a portfolio, a volatility measure that is intuitive for most investors.
The latest version of Portfolio Lab is enhanced to also display the recovery from the drawdown. The recovery is the first day after the trough when the portfolio losses are recovered, as shown in green in the chart below:

Portfolio maximum drawdown